The scope of the project:
Eagle Housing Phase 3 project consists of pavement of 80000 sq ft of asphalt roads, twin tennis court, mini soccer field, 9 holes mini golf, running track – 1000 meters long, 7 shading pergolas, 5 gazebos, community sidewalks and landscaping including grass seeding and plantings. Phase 3 consists of 44 housing units; 38 JNCO- Junior Non Commissioned Officers, 2 CGO-Company Grade Officer, and 4 JNCO-Handicapped units with 2 vehicle parking- drive way, wooden fenced backyards. All units paved with ceramic floor tiles, terra cotta entrances and front stairs, laminated wooden closets and kitchen cabinets c/w granite countertops.
2 story units are all covered by heat insulated CMU blocks and thermal boards for energy consumption and painted with long lasting textured paints. All aluminum windows are thermal insulated.
Achievements: The Eagle Housing Project was completed on-time (1.5 months ahead of the schedule) without any registered lost time accidents. The project fulfilled all the quality expectations.