MILCON Drainage System Phase III, Bagram Air Base
The brief summary of the project:
The regarded project is a third phase of the MILCON Drainage System projects. Micro-tunneling, sanitary sewer collection piping, manholes, catchbasins, water wells, utility bridges, sanitary sewer lift stations and re-construction of runways are included in this project. Apart from these, an achievement of 1,500,000 safe man-hours with no lost time incident were performed during the construction works.
Project Details
Project Type | Bid – Build |
Project Location | Bagram, AFGHANİSTAN |
Owner | USACE |
Project Start | 15 August 2012 |
Project End | 01 June 2014 |
Contract Value | $ 19,195,545.39 |