Design and Construction of Diplomatic Facilities at Sather Air Base in Baghdad
The brief summary of the project:
The core of the project scope involved the installation and retrofitting of government furnished (GF) PODs. These CHU POD’s are grouped in two types of pods: dry CHU pods and wet CHU pods. Both types of pods feature central “safe havens,” which consist of doors and walls capable of resisting forced entry for five minutes. The CHU’s are double-stacked over concrete foundations. An overhead protective cover (OPC) system is erected over each pod.
Project Details
Project Type | Design – Build |
Project Location | Baghdad, IRAQ |
Owner | US Department of State, OBO |
Project Start | 16 February 2012 |
Project End | 18 April 2013 |
Contract Value | 119,182,971.68 $ |