Kıyıköy Wind Power Plant

Project Details

Project Type Design – Build
Project Location Tekirdağ, TURKEY
Owner Beşiktepe Enerji Üretim ve Ticaret A.Ş.
Project Start 1 September 2014
Project End 1 November 2015
Contract Value $ 62,000,000.00

Key Project Quantities:

    • 15 x Nordex N117/3000 kW
    • 15 x 3 MW = 45 MWm/44 MWe
    • 62,5/50 MVA Transformer Substation
    • Production : 170.800.000 kWh ( P50 )
    • Capacity factor : %44
    • 13 km access roads
    • 36 km underground MV cable
    • 25 km F/O cable