Key Project Quantities:
- Water Transmission Line (L=223 m, D=5.50 m)
- Water Intakes And Settling Basin (3 Nos 6.00×3.50 M Vertical Inlet Gate)
- Drill and Blast Water Tunnel (L=6570 m, D=4.50 m horse-shoe lined tunnel)
- Surge Tank (D=18 m, H=64 m circular section, steel lined reinforced concrete)
- Penstock (L=84 m, D= 3×1.50 m circular section, embedded in reinforced concrete underground)
- Power Plant (3 units, each 8.40 MW, total installed capacity is 25.20 MW, 126,000,000 KWh/year energy production)
- 500,000 m3 earthworks